Skip to main content
Chrome icon

New! Check service status instantly with our Chrome extension

Add to Chrome External link icon
Firefox icon

New! Check service status instantly with our Firefox extension

Add to Firefox External link icon
magnifying glass icon
magnifying glass icon
  • Can't find service? Request service
    Sign Up
    Home • Service directory • DocuSign • Outage History
    DocuSign icon
    DocuSign icon

    DocuSign Outage History

    Minor DocuSign outage

    There were 139 DocuSign outages since January 2025 which are summarized below, including incident details, duration, and resolution information.

    DocuSign not working for you?

    DocuSign not working for you?

    minor icon Minor

    : DocuSign latency affects conversions, document generation, and tasks

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (2 hours and 15 minutes)

    Users attempting conversions, document generation, or task access within DocuSign faced latency across key areas of the platform. The issue impacted eSignature components NA4 and NA2 and CLM components S1.US, NA21, and NA11, causing slower sending actions, delays in generating documents, and slower task access for some customers. The impact stretched across these components from onward as engineers investigated the root cause.

    Status updates indicated the issue and that a fix was being implemented by ; all affected components returned to normal by .

    minor icon Minor

    : DocuSign UAT latency and ZIP seal issue resolved

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (10 hours and 40 minutes)

    DocuSign experienced latency in the CLM/UAT NA11 environment, impacting activity on the UAT platform. Impact began at as engineers triaged the issue; by the source had been identified and a fix was being prepared. The fix was implemented by , with telemetry monitored to validate remediation.

    Later, at , a separate issue was noted where users downloading archived document ZIP files may see missing official DocuSign platform seals (Incident 5139); the fix was still in progress and deployment ongoing. The CLM/UAT NA11 component returned to up by as services stabilized.

    minor icon Minor

    : DocuSign Spreedly Core API brief maintenance

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (5 minutes)

    During a brief maintenance window on to , the Third Party Services / Spreedly Core Transactional API was listed as under maintenance. This period could have caused intermittent transaction processing or connectivity issues for users relying on this API. The impact appeared limited to that component and did not indicate a broader DocuSign service disruption.

    DocuSign posted two status updates during the incident. The maintenance started at and completed by , with services returning to normal after the maintenance window.

    minor icon Minor

    : DocuSign Spreedly Core API degraded, then recovered

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (16 hours and 5 minutes)

    DocuSign experienced degraded performance for the Spreedly Core Transactional API, impacting integrations that rely on this service. The degradation began with a warn state at and persisted into the next day. Maintenance was engaged at and the API returned to full operation at . The incident included three official status updates and lasted roughly 16 hours and 5 minutes, from the initial warn to full restoration.

    minor icon Minor

    : DocuSign eSignature latency impacts subset of users

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (55 minutes)

    A subset of DocuSign customers experienced intermittent latency when sending or receiving eSignature jobs. The issue affected two components, eSignature / NA3 and eSignature / NA1, and engineers were actively triaging the problem. The incident began at . The latency persisted for about 55 minutes and the status returned to normal at . DocuSign issued 2 official status updates during the incident.

    minor icon Minor

    : DocuSign CLM EU21 degraded during uploads/downloads

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (55 minutes)

    DocuSign reported degraded performance affecting the CLM EU21 region, with users experiencing slowness and failures during content uploads and downloads. The issue prompted an investigation, and the CLM EU21 component was downgraded to a degraded state at . The outage lasted about 55 minutes, and service returned to normal by as updates indicated resolution. Impact appeared limited to the CLM EU21 component, with no broader service disruption indicated.

    minor icon Minor

    : DocuSign CLM NA11 access issues resolved

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (1 hour and 5 minutes)

    DocuSign CLM NA11 customers experienced issues accessing their accounts and performing actions within the CLM platform. The incident began at and was resolved by , lasting about 1 hour and 5 minutes with regional impact in the CLM NA11 environment. DocuSign acknowledged the issue and published two official updates as engineers investigated, describing the incident as a degraded service for the NA11 region. The status later returned to up, fully restoring access and actions for affected users.

    minor icon Minor

    : DocuSign DEMO/UAT degradation impacts Navigator, Prepare, Webforms

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (3 hours and 15 minutes)

    DocuSign reported a degradation in its Demo/UAT environment affecting Navigator, Prepare, Webforms, and IAM ingestion. DEMO/UAT users may have experienced issues with Webforms not saving, document ingestion failures, and missing ID verification or healthcare fields in Prepare, with portions of Navigator failing to load. The impact was isolated to the DEMO/UAT environment and affected two components: eSignature / DEMO and Rooms / DEMO. The incident began at and was resolved by , lasting approximately 3 hours 15 minutes. The provider issued 2 status updates during the incident.

    minor icon Minor

    : DocuSign brief degraded state during test incident

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (1 hour and 55 minutes)

    DocuSign briefly listed a degraded state during a test incident. The status page transitioned from up to warn at and returned to up at , for a total duration of about 1 hour 55 minutes. No user-facing issues were reported, and the incident was described on the status page as a test with no further details. The service returned to normal after the final update.

    minor icon Minor

    : DocuSign Spreedly API briefly degraded, recovered quickly

    Detected by StatusGator:
    Officially acknowledged:
    Outage ended: (5 minutes)

    DocuSign experienced a brief degraded state in the Third Party Services / Spreedly Core Transactional API, with intermittent delays for transactions routed through this API. The issue was limited to this single component and did not affect other DocuSign services. The incident began at and was resolved by as the status page moved from up to warn and back to up.

    DocuSign icon

    Looking for more DocuSign outage stats?

    Get real-time insights and historical data on DocuSign outages.

    Looking to track DocuSign downtime and outages?

    • Receive real-time status updates
    • Show current status on private or public status page
    • Be the first to know if service is down
    • Keep your team informed
    • Monitor alongside other services and websites
    Start monitoring for free